The circuit looks a long way from finished. The whole bitumen surface is depressed a few inches from all the kerbs suggesting that they still need to lay the very top surface.
Excitement level is very low after watching that vid. Even though it will likely be finished I cant see the venue ebing 100% ready and up to what we are told that Bernie frequently demands of other venues
|