View Single Post
Old 12 Sep 2015, 08:33 (Ref:3573338)   #61
socram
Veteran
 
socram's Avatar
 
Join Date: Dec 2007
New Zealand
Auckland
Posts: 920
socram should be qualifying in the top 5 on the gridsocram should be qualifying in the top 5 on the grid
Old (derelict) stand between the apartments blocks - gone.
Vertical concrete slabs for the control tower ground floor walls, between the two sets of garages, were being assembled today whilst we were there (Saturday).
Grader seems to have already started on the track extension, removing the preload.
Footings prepared just after the tunnel, where the fuel supply was, for a building, which I gather might include showers and driver facilities. (Not confirmed.)
Work also seems to have started on the hospitality suites above the pit garages - which should please the regular hirers, as some of the garages have not been watertight.
New metal base for a road outside turn 1 laid.
Various other bits and pieces seem to be being worked on which is all great news.
socram is offline  
__________________
I always did march to a different drumbeat - Peter Brock
Quote