track 21 contains a fast, oval style first half with minimal runoff, and a slow second half with plenty of runoff. scale is 1cm=30m, giving the start/finish straight a length of 300m(10cm). T1 has 10 degree banking and T4 has 4 degree banking. pit out is not banked.
|