View Single Post
Old 25 Nov 2019, 02:43 (Ref:3942670)   #77
Umai Naa
Veteran
 
Join Date: Dec 2011
Posts: 7,396
Umai Naa should be qualifying in the top 5 on the gridUmai Naa should be qualifying in the top 5 on the grid
360 days a year, it's a public road so not much you can do to it. Things like drainage, the light rail network, and underground traffic light sensors need to be considered.

The other thing too, is extending the length extends the cost of setup and packdown. The turn 11 hairpin extension wasn't much in the way of an extra cost.
Umai Naa is offline  
Quote