Quote:
Originally Posted by CTD
If the 90X is following the same timeline then a "finished" 90X will be ready in late december / early january.
What we have seen is probably only the first shakedowns of the engine in the 90X tub.
|
Given the fact that the shakedown shots date back to July, Peugeot seems to be at least 4 months ahead compared to the 908, thus I expected them to be much better sorted out during the early season than in 2007.