I just saw a map of all the proposed construction they will have for the 2028 Olympics in Long Beach. Where grandstand 18 is, they will build a swimming pool. Long beach will be hosting 7 events. I guess it will take them 4 years to build all this. Thoughts on whether they will be able to have the existing circuit or a modified circuit down there during the construction/after its built?
https://lbpost.com/longbeachize/long...mmer-olympics/