|
||||||||||
|
||||||||||
17 Jun 2019, 13:40 (Ref:3912433) | #10 | ||
Race Official
Veteran
Join Date: Jul 2003
Posts: 5,704
|
Is the long straight tunnelling or dredging the earlier section of track?
As drawn it appears to be tunnel but there isn't much space from a tunnel exit to pit entry. |
||
|
|
|
Similar Threads | ||||
Thread | Thread Starter | Forum | Replies | Last Post |
Thuxton kerbs | jordan81 | Bike Racing | 5 | 30 May 2011 14:02 |
GT2 - battle lines drawn - the ACO declares war............ | Bentley03 | ACO Regulated Series | 42 | 26 Mar 2010 21:25 |
Monza kerbs | olly83 | Formula One | 45 | 14 Sep 2009 02:51 |